IX-AG-MP60 High-Flow Motor Pump Specifications, Operation & Selection Guide
A farm water-pump or irrigation unit moves water at a rated flow and head into field distribution, transfer or drip-irrigation systems.

What is IX-AG-MP60?
IX-AG-MP60 is an IXORTA high-flow motor pump. A farm water-pump or irrigation unit moves water at a rated flow and head into field distribution, transfer or drip-irrigation systems. Its principal catalogue values are Rated power: 15 HP; Inlet / outlet: 6 in / 6 in.
Start with the IXORTA Agriculture product range, then use this model page to assess fit, operating needs and the information required for a quotation.
IX-AG-MP60 catalogue specifications
The values below come from the supplied 2026 IXORTA catalogue. Use them to build an initial shortlist, then confirm the exact configuration, options and acceptance criteria in the model-specific quotation.
| Rated power | 15 HP |
|---|---|
| Inlet / outlet | 6 in / 6 in |
| Maximum flow | 2000 L/min |
| Maximum head | 30 m |
Before ordering: confirm the duty, usable capacity, overall dimensions, utilities, safety package, controls, attachments and documentation for the destination market. Download the division catalogue.
Where IX-AG-MP60 sits in the range
IX-AG-MP60 sits between the smaller and larger configurations in this 4-model range, making side-by-side specification comparison especially important.
Shortlist this model when the planned duty is close to its listed values. If the application regularly approaches a limit, compare the adjacent models below and ask IXORTA to check working margin, cycle expectations and future capacity.
How the IX-AG-MP60 works
The operator confirms water source, suction sealing, priming, discharge route and safe engine position before starting. Flow is introduced gradually and the system is monitored for cavitation, leaks and pressure.
The safe sequence depends on the supplied guards, controls, utilities and attachments. Operators should follow the delivered manual, training and site risk assessment. For process examples and planning articles, continue to the IXORTA Agriculture industry guides.
Manufacturing and acceptance checks
Review pump casing and impeller, engine coupling, seals, frame, hose connections, guards, controls and a flow-and-head test. Irrigation assemblies also require filtration and distribution review.
A useful factory-acceptance record identifies the agreed configuration, principal components, inspection points, test material or load, observed results, open actions, documentation set, packing method and release approval. See IXORTA Agriculture project scopes for the wider delivery context.
Applications and selection questions
Typical applications
- field irrigation
- water transfer
- drip-irrigation supply
- farm reservoir service
Confirm before selection
- required flow
- total dynamic head
- suction lift
- pipe diameter
- water quality and filtration
- fuel and service access
A catalogue capacity alone is not enough. IXORTA should receive the normal and peak operating range, site conditions, utilities, operator experience, destination and delivery constraints before recommending a configuration. Review the division buyer FAQs before sending the enquiry.
Practical working sequence
- Define the job. Record material, load, output, quality and environmental requirements.
- Inspect before start. Check guards, fluids, fasteners, tooling or attachments, connections and the work area.
- Set the equipment. Apply the model manual, verified program or calibrated field setting.
- Prove at low risk. Run a dry cycle, first part, clean-water test or short field pass as appropriate.
- Monitor production. Watch load, sound, temperature, quality, flow, alignment and safety devices.
- Close and record. Isolate safely, clean, inspect wear and log service actions.
Use the project enquiry form to identify any required training, commissioning or operator documentation.
Maintenance priorities
- drain and clean after dirty-water use
- check seals, hoses and clamps
- service engine filters and oil
- protect from freezing and dry storage
Intervals depend on operating hours, duty, dust, heat, water quality and the surrounding environment. The delivered manual and component schedules control the final service plan. Send spare-parts and service questions through the IXORTA contact page.
Field planning for the Middle East, Africa, Russia and Central Asia
Match every machine to farm size, climate, soil, crop, tractor power, hitch, PTO or hydraulic flow, seasonal work window, inland transport, operator experience and first-season spare-parts access.
For a useful export quotation, include the destination port, inland route, unloading equipment, site access, local standards, document language, commissioning responsibility and critical spare-parts expectation. Browse regional project examples.
Request a IX-AG-MP60 quotation
Send the intended application, capacity, destination and site conditions. The request is routed to the IXORTA team with this division and model already identified.
Frequently asked questions about IX-AG-MP60
What is the IX-AG-MP60 High-Flow Motor Pump used for?
A farm water-pump or irrigation unit moves water at a rated flow and head into field distribution, transfer or drip-irrigation systems. Typical applications include field irrigation, water transfer, drip-irrigation supply, farm reservoir service.
How does the IX-AG-MP60 work?
The operator confirms water source, suction sealing, priming, discharge route and safe engine position before starting. Flow is introduced gradually and the system is monitored for cavitation, leaks and pressure.
What are the catalogue specifications for IX-AG-MP60?
Rated power is 15 HP; Inlet / outlet is 6 in / 6 in; Maximum flow is 2000 L/min; Maximum head is 30 m. These are catalogue-listed reference values and must be confirmed in the final quotation.
What information should a buyer send for a IX-AG-MP60 quotation?
Send the application, required capacity, materials or operating conditions, utilities, destination country and port, site constraints, preferred options, project timing and installation expectations.
What should be checked before shipment?
The agreed configuration, safety equipment, dimensions, utilities, documentation, factory acceptance scope, packing, spare-parts list, installation responsibilities and destination requirements should be recorded before release.
Source and verification
This article is based on the IXORTA 2026 IXORTA Agriculture catalogue. Final technical values, options, compliance, availability and performance acceptance criteria must be confirmed in the signed quotation.