IX-AG-TR90 Farm Tractor Specifications, Operation & Selection Guide
A four-wheel-drive farm tractor supplies tractive force, PTO power and hydraulic lift for field implements, transport and general farm work.

What is IX-AG-TR90?
IX-AG-TR90 is an IXORTA farm tractor. A four-wheel-drive farm tractor supplies tractive force, PTO power and hydraulic lift for field implements, transport and general farm work. Its principal catalogue values are Rated power: 90 HP; Drive: 4WD.
Start with the IXORTA Agriculture product range, then use this model page to assess fit, operating needs and the information required for a quotation.
IX-AG-TR90 catalogue specifications
The values below come from the supplied 2026 IXORTA catalogue. Use them to build an initial shortlist, then confirm the exact configuration, options and acceptance criteria in the model-specific quotation.
| Rated power | 90 HP |
|---|---|
| Drive | 4WD |
| Transmission | 12F + 12R |
| PTO | Catalogue-listed 54 / 1000 rpm |
| Lift capacity | 3000 kg |
Before ordering: confirm the duty, usable capacity, overall dimensions, utilities, safety package, controls, attachments and documentation for the destination market. Download the division catalogue.
Where IX-AG-TR90 sits in the range
IX-AG-TR90 sits between the smaller and larger configurations in this 4-model range, making side-by-side specification comparison especially important.
Shortlist this model when the planned duty is close to its listed values. If the application regularly approaches a limit, compare the adjacent models below and ask IXORTA to check working margin, cycle expectations and future capacity.
How the IX-AG-TR90 works
The operator completes a fluid and safety inspection, attaches the implement with the correct hitch and PTO arrangement, sets ballast and tyre pressure, then works within the rated gear, speed and hydraulic limits.
The safe sequence depends on the supplied guards, controls, utilities and attachments. Operators should follow the delivered manual, training and site risk assessment. For process examples and planning articles, continue to the IXORTA Agriculture industry guides.
Manufacturing and acceptance checks
Pre-delivery checks should cover engine and cooling, transmission, axles, brakes, steering, PTO speeds, hydraulic lift, electrical system, rollover protection or cab, tyre fitment and an operational test under load.
A useful factory-acceptance record identifies the agreed configuration, principal components, inspection points, test material or load, observed results, open actions, documentation set, packing method and release approval. See IXORTA Agriculture project scopes for the wider delivery context.
Applications and selection questions
Typical applications
- tillage
- seeding
- mowing
- transport and utility work
Confirm before selection
- implement power demand
- 4WD traction need
- transmission range
- PTO compatibility
- hydraulic lift capacity
- cab, climate and tyre options
A catalogue capacity alone is not enough. IXORTA should receive the normal and peak operating range, site conditions, utilities, operator experience, destination and delivery constraints before recommending a configuration. Review the division buyer FAQs before sending the enquiry.
Practical working sequence
- Define the job. Record material, load, output, quality and environmental requirements.
- Inspect before start. Check guards, fluids, fasteners, tooling or attachments, connections and the work area.
- Set the equipment. Apply the model manual, verified program or calibrated field setting.
- Prove at low risk. Run a dry cycle, first part, clean-water test or short field pass as appropriate.
- Monitor production. Watch load, sound, temperature, quality, flow, alignment and safety devices.
- Close and record. Isolate safely, clean, inspect wear and log service actions.
Use the project enquiry form to identify any required training, commissioning or operator documentation.
Maintenance priorities
- check engine oil, coolant and filters
- inspect tyres and wheel fasteners
- service hydraulic and transmission fluids
- grease hitch and steering points
Intervals depend on operating hours, duty, dust, heat, water quality and the surrounding environment. The delivered manual and component schedules control the final service plan. Send spare-parts and service questions through the IXORTA contact page.
Field planning for the Middle East, Africa, Russia and Central Asia
Match every machine to farm size, climate, soil, crop, tractor power, hitch, PTO or hydraulic flow, seasonal work window, inland transport, operator experience and first-season spare-parts access.
For a useful export quotation, include the destination port, inland route, unloading equipment, site access, local standards, document language, commissioning responsibility and critical spare-parts expectation. Browse regional project examples.
Request a IX-AG-TR90 quotation
Send the intended application, capacity, destination and site conditions. The request is routed to the IXORTA team with this division and model already identified.
Frequently asked questions about IX-AG-TR90
What is the IX-AG-TR90 Farm Tractor used for?
A four-wheel-drive farm tractor supplies tractive force, PTO power and hydraulic lift for field implements, transport and general farm work. Typical applications include tillage, seeding, mowing, transport and utility work.
How does the IX-AG-TR90 work?
The operator completes a fluid and safety inspection, attaches the implement with the correct hitch and PTO arrangement, sets ballast and tyre pressure, then works within the rated gear, speed and hydraulic limits.
What are the catalogue specifications for IX-AG-TR90?
Rated power is 90 HP; Drive is 4WD; Transmission is 12F + 12R; PTO is Catalogue-listed 54 / 1000 rpm; Lift capacity is 3000 kg. These are catalogue-listed reference values and must be confirmed in the final quotation.
What information should a buyer send for a IX-AG-TR90 quotation?
Send the application, required capacity, materials or operating conditions, utilities, destination country and port, site constraints, preferred options, project timing and installation expectations.
What should be checked before shipment?
The agreed configuration, safety equipment, dimensions, utilities, documentation, factory acceptance scope, packing, spare-parts list, installation responsibilities and destination requirements should be recorded before release.
Source and verification
This article is based on the IXORTA 2026 IXORTA Agriculture catalogue. Final technical values, options, compliance, availability and performance acceptance criteria must be confirmed in the signed quotation.